In a chemical plant producing mainly cellulose derivatives, an explosion and fire occurred at about 4 pm during the restart of a production line stopped for 9 h after a breakdown. The commissioning of the vacuum belt filter by the[...]
At 11.57 AM a power failure occurred in a refinery. The supply of electrical power was cut off, as a result of the failure of the main power line during maintenance. Because of this the refinery was almost completely powerless,[...]
Inside a pesticides plant with 520 employees, a 17-m³ reservoir used to treat methomyl residues in a methylisobutyl ketone (MTBK) solvent suddenly rose in pressure at 10:20 pm and exploded 15 min later, seriously damaging the production unit, ripping apart[...]
The bottom of a 13,500 m³ containing 12,000 m³ of light crude oil tank ripped open at 8:00 am within an oil depot. The earthen dikes surrounding the retention basin withstood the wave effect; 2,000 m³ of oil still overflowed[...]
Approximately 2 kg of propane were released into the atmosphere at an LPG filling centre (Seveso installation) and designed to supply customers throughout the region.A tank car was moved while it was being loaded, causing a gas leak. Positioned at[...]
At a chemical plant, a styrene tank "imploded" causing the release of approx. 3 tonnes of styrene product. On the day of the accident, the (44-m³) tank was being filled via a tanker truck when the driver noticed that the[...]
At around 5 p.m., a massive explosion destroyed a 4-storey building consisting of 10 flats, killing 17 people and injuring 15 others. Two semi-detached council housing buildings were damaged (10 flats). One hundred firemen intervened, assisted by search and rescue teams:[...]
In a chemical plant, an explosion occurred when a glyoxylic acid production line using the ozonisation technique was re-started. The facility was destroyed a year ago by an explosion followed by a fire (ARIA 25337). The internal emergency plan and the[...]
Analyses carried out on the residual water at the discharge point of a waste water treatment plant at a chemical plant manufacturing a basic organic product revealed that the thresholds of the standards stipulated by prefectural order had been significantly[...]
At a chemical facility, an explosion and fire occurred around 5 pm inside a laboratory on the first floor of a 4-storey, 400-m² building. The personnel were evacuated and the internal emergency plan activated. Air samples extracted from the premises[...]