Advanced Search

Release of styrene following a power cut

At 10:46 pm during a thunderstorm, an electrical outage interrupted polystyrene (PS) production at a chemical site where 27 of the 160 employees were on the job. A safety disc broke and styrene was released. The crystal manufactured polystyrene (CMP)[...]
Read More

Explosion in a pharmaceutical factory

An explosion occurred around noon while conducting hot work (with a disc saw) on a 320-m³ fixed-roof tank at a pharmaceutical plant employing 240 personnel. The tank cover was blasted 20 m away and the subcontractor performing cutting works was[...]
Read More

Fire of solar panels on the roof of a warehouse

Fire broke out around 3:30 pm on the roof of a 15,000-m² warehouse covered by 1,000 m² of solar panels (totalling some 660 panels). The building, inaugurated in November 2009, had received an HQE (highest environmental quality rating) certification; it[...]
Read More

Explosion in an plant manufacturing polymers

In an upper-tier Seveso-rated plant manufacturing polymers used for water treatment applications, and despite the differentiated storage and packaging zones, a technician assigned the morning shift poured by mistake 1 to 2 kg of sodium hypophosphite classified non-hazardous into a[...]
Read More